Clackamas Commons
Clackamas, OR
This six building industrial complex situated on 21-acre site was built in three phases. All buildings were designed using tilt-up concrete construction. To minimize development costs and impacts to the local infrastructure, VLMK designed a regional stormwater retention system consisting of two ponds – one a water treatment pond and the other an infiltration pond. A centralized fire pump provides a high pressure fire loop system to serve the ESFR fire protection sprinkler demands for the entire complex.









